Back to news list
19.10.2026
19.10.2026
DAY 2: WALL LEVELING AND REPAINTING
Hanoi, Vietnam • Hòa Lạc Hi-Tech Park • October 18
More details via the link: https://youtube.com/shorts/clYUs-XwsWY?si=rTY4wbe2NGZWSa_L
Continuation of finishing work in the first large room: sealing unused openings, leveling the walls with putty, sanding the surface, and applying a second coat of paint.
Best regards,
the “Dilan Mirror“ team
Brand