Back to news list

DAY 3: FLOOR PREPARATION AND INSTALLATION OF THE NEW FLOORING

Hanoi, Vietnam • Hòa Lạc Hi-Tech Park • October 19

More details via the link: https://youtube.com/shorts/AuYpxJ_6Jqk?si=0yhf1mSWa0CDjsnM


Floor preparation and the start of new flooring installation: removal of the old flooring, removal of leftover materials, thorough surface cleaning, and installation of the first sections of the new floor.


Best regards,

the “Dilan Mirror“ team

Brand