Back to news list
22.10.2026
22.10.2026
DAY 5: NORTHERN SECTION OF THE ASSEMBLY CENTER — 75% READY
Hanoi, Vietnam • Hòa Lạc High-Tech Park • October 21
More details at the link: https://youtube.com/shorts/Z_VePDJNOWE?si=_Ed9563jGQlFxbhm
Flooring installation across an area of 144 m² has been completed. The project provides for designated areas for assembly and component storage. Baseboard installation is 50% complete, and the joints have been sealed.
Best regards,
the “Dilan Mirror“ team
Brand